by abdulhafiz | Jan 27, 2021 | Progress Reports
I. VILLAS CONSTRUCTION PROGRESS 1. Villa A2 Finished Constructing Stages:a) Attic roof concrete pitched slab b) Mechanical and electrical pipes and connections c) Plaster Workd) Sandtex Painte) Claddingf) Tiling in progress Figure 1: Block Work Figure 2: Plaster Work...
by abdulhafiz | Sep 28, 2020 | Progress Reports
I. VILLAS CONSTRUCTION PROGRESS 1. Villa A2 Figure 1 Ground floor slab formwork Figure 2 Ground floor slab reinforcements Figure 3 Ground floor after casting of concrete Figure 4 Formwork for ground floor columns Figure 5 Ground floor columns after concrete casting...
by abdulhafiz | Sep 21, 2020 | All blogs
It’s safe to say that, with everything going on all around the world, this year has proven to be no less than exceptional. However, this is certainly an understatement in Lebanon’s case since it wasn’t enough to go through an economic crisis, devaluation of the local...
by abdulhafiz | Aug 21, 2020 | Progress Reports
I. VILLAS CONSTRUCTION PROGRESS 1. Villa A2 Construction stage: a) Columns at the basement level are constructedb) Mid retaining walls are executedc) Columns and walls in contact with soil are isolated using Bitumend) MEP pipes are installed along with the columnse)...
by abdulhafiz | Aug 21, 2020 | Progress Reports
I. OVERVIEW Ohana Hills is a passionate project aiming to construct 84 Villas according to the highest structural standards and finishing quality. Located at Medyar village in Damour, this unique location allows you to enjoy the beauty and peacefulness of nature while...