Ohana Hills Progress Report – April 2022

Ohana Hills Progress Report – April 2022

Completed Villas: 1. Villa A1 2. Villa A2 3. Villa H2 Cladding and Tiling Stage: In this stage, all the stonework, Alucobond, paint work and floor tiles are fabricated and installed. 1. Villa A6 -7 2. Villa A8-9 3. Villa B3 4. Villa B4 5. Villa B7 6. Villa C1 7. Villa...
Ohana Hills Progress Report – October 2021

Ohana Hills Progress Report – October 2021

VILLAS CONSTRUCTION PROGRESS 1. Villa A2 Villa is Finished 3. Villa B1 Blockwork stage 4. Villa B2 Attic Floor level 5. Villa B3 Finishing Stage 6. Villa B4  Plasterwork Stage 7. Villa B5 Blockwork Stage 8. Villa B6 Blockwork Stage 9. Villa B7 Blockwork Stage 10....
Ohana Hills Progress Report – April 2021

Ohana Hills Progress Report – April 2021

I. VILLAS CONSTRUCTION PROGRESS 1. Villa C11 Finished villas construction stages in the last 4 monthsa) Excavation b) Foundations c) Slab on grade d) Basement Columns and retaining walls e) Ground Floor PT slab f) Partition and exterior walls g) Bitumen Isolation 2....
Ohana Hills Progress Report – January 2021

Ohana Hills Progress Report – January 2021

I. VILLAS CONSTRUCTION PROGRESS 1. Villa A2 Finished Constructing Stages:a) Attic roof concrete pitched slab b) Mechanical and electrical pipes and connections c) Plaster Workd) Sandtex Painte) Claddingf) Tiling in progress Figure 1: Block Work Figure 2: Plaster Work...
Ohana Hills Progress Report – August 2020

Ohana Hills Progress Report – August 2020

I. VILLAS CONSTRUCTION PROGRESS 1. Villa A2 Figure 1 Ground floor slab formwork Figure 2 Ground floor slab reinforcements Figure 3 Ground floor after casting of concrete Figure 4 Formwork for ground floor columns Figure 5 Ground floor columns after concrete casting...
Ohana Hills Progress Report – April 2020

Ohana Hills Progress Report – April 2020

I. VILLAS CONSTRUCTION PROGRESS 1. Villa A2 Construction stage: a) Columns at the basement level are constructedb) Mid retaining walls are executedc) Columns and walls in contact with soil are isolated using Bitumend) MEP pipes are installed along with the columnse)...