I. VILLAS CONSTRUCTION PROGRESS
1. Villa A2
![Luxury Villas In Lebanon - Progress Report August2020- img1](https://ohana-hills.com/wp-content/uploads/2020/09/0.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img2](https://ohana-hills.com/wp-content/uploads/2020/09/1-1.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img3](https://ohana-hills.com/wp-content/uploads/2020/09/2.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img4](https://ohana-hills.com/wp-content/uploads/2020/09/3.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img5](https://ohana-hills.com/wp-content/uploads/2020/09/4.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img6](https://ohana-hills.com/wp-content/uploads/2020/09/5.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img7](https://ohana-hills.com/wp-content/uploads/2020/09/6.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img8](https://ohana-hills.com/wp-content/uploads/2020/09/7.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img9](https://ohana-hills.com/wp-content/uploads/2020/09/8.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img10](https://ohana-hills.com/wp-content/uploads/2020/09/9.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img11](https://ohana-hills.com/wp-content/uploads/2020/09/10.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img12](https://ohana-hills.com/wp-content/uploads/2020/09/11.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img13](https://ohana-hills.com/wp-content/uploads/2020/09/12.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img14](https://ohana-hills.com/wp-content/uploads/2020/09/13.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img15](https://ohana-hills.com/wp-content/uploads/2020/09/14.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img16](https://ohana-hills.com/wp-content/uploads/2020/09/15.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img17](https://ohana-hills.com/wp-content/uploads/2020/09/16.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img18](https://ohana-hills.com/wp-content/uploads/2020/09/17.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img19](https://ohana-hills.com/wp-content/uploads/2020/09/18.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img20](https://ohana-hills.com/wp-content/uploads/2020/09/19.bmp)
2. Villa B1
Finished construction stages:
a) Basement columns and retaining walls
b) Ground floor slab
c) Basement block/partition walls
![Luxury Villas In Lebanon - Progress Report August2020- img21](https://ohana-hills.com/wp-content/uploads/2020/09/00.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img21](https://ohana-hills.com/wp-content/uploads/2020/09/20.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img22](https://ohana-hills.com/wp-content/uploads/2020/09/21.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img23](https://ohana-hills.com/wp-content/uploads/2020/09/22.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img24](https://ohana-hills.com/wp-content/uploads/2020/09/23.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img25](https://ohana-hills.com/wp-content/uploads/2020/09/24.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img26](https://ohana-hills.com/wp-content/uploads/2020/09/25.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img27](https://ohana-hills.com/wp-content/uploads/2020/09/26.bmp)
3. Villa B2
Finished construction stages:
a) Excavation
b) Blinding concrete layer
c) Foundations
d) Column necks and retaining walls
e) Swimming Pool
![Luxury Villas In Lebanon - Progress Report August2020- img28](https://ohana-hills.com/wp-content/uploads/2020/09/000.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img29](https://ohana-hills.com/wp-content/uploads/2020/09/27.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img30](https://ohana-hills.com/wp-content/uploads/2020/09/28.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img31](https://ohana-hills.com/wp-content/uploads/2020/09/29.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img32](https://ohana-hills.com/wp-content/uploads/2020/09/30.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img33](https://ohana-hills.com/wp-content/uploads/2020/09/31.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img34](https://ohana-hills.com/wp-content/uploads/2020/09/32.bmp)
4. Villa B3
Finished construction stages:
a) Foundations
b) Basement slab on grade
c) Basement Columns and retaining walls
d) Swimming Pool
![Luxury Villas In Lebanon - Progress Report August2020- img35](https://ohana-hills.com/wp-content/uploads/2020/09/0000.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img36](https://ohana-hills.com/wp-content/uploads/2020/09/33.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img37](https://ohana-hills.com/wp-content/uploads/2020/09/34.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img38](https://ohana-hills.com/wp-content/uploads/2020/09/35.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img39](https://ohana-hills.com/wp-content/uploads/2020/09/36.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img40](https://ohana-hills.com/wp-content/uploads/2020/09/37.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img41](https://ohana-hills.com/wp-content/uploads/2020/09/38.bmp)
5. Villa B4
Finished construction stages:
a) Foundations
b) Basement Slab on grade
c) Basement Columns
![Luxury Villas In Lebanon - Progress Report August2020- img42](https://ohana-hills.com/wp-content/uploads/2020/09/00000.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img43](https://ohana-hills.com/wp-content/uploads/2020/09/39.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img44](https://ohana-hills.com/wp-content/uploads/2020/09/40.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img45](https://ohana-hills.com/wp-content/uploads/2020/09/41.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img46](https://ohana-hills.com/wp-content/uploads/2020/09/42.bmp)
6. Villa B5
Finished construction stages:
a) Excavation
b) Blinding layer
c) Foundations
d) Column necks
![Luxury Villas In Lebanon - Progress Report August2020- img47](https://ohana-hills.com/wp-content/uploads/2020/09/000000.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img48](https://ohana-hills.com/wp-content/uploads/2020/09/43.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img49](https://ohana-hills.com/wp-content/uploads/2020/09/44.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img50](https://ohana-hills.com/wp-content/uploads/2020/09/45.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img51](https://ohana-hills.com/wp-content/uploads/2020/09/46.bmp)
7. Villa B6
Finished construction stages:
a) Basement columns and retaining walls
![Luxury Villas In Lebanon - Progress Report August2020- img52](https://ohana-hills.com/wp-content/uploads/2020/09/0000000.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img53](https://ohana-hills.com/wp-content/uploads/2020/09/47.bmp)
8. Villa B7
Finished construction stages:
a) Basement columns and retaining walls
![Luxury Villas In Lebanon - Progress Report August2020- img54](https://ohana-hills.com/wp-content/uploads/2020/09/00000000.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img55](https://ohana-hills.com/wp-content/uploads/2020/09/48.bmp)
9. Villa C1
Finished construction stages:
a) Basement columns and retaining walls
b) Ground floor slab
![Luxury Villas In Lebanon - Progress Report August2020- img56](https://ohana-hills.com/wp-content/uploads/2020/09/000000000.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img57](https://ohana-hills.com/wp-content/uploads/2020/09/49.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img58](https://ohana-hills.com/wp-content/uploads/2020/09/50.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img59](https://ohana-hills.com/wp-content/uploads/2020/09/51.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img60](https://ohana-hills.com/wp-content/uploads/2020/09/52.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img61](https://ohana-hills.com/wp-content/uploads/2020/09/53.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img62](https://ohana-hills.com/wp-content/uploads/2020/09/54.bmp)
10. Villa C2
Finished construction stages:
a) Slab on grade
b) Basement columns and retaining walls
c) Ground floor slab
![Luxury Villas In Lebanon - Progress Report August2020- img63](https://ohana-hills.com/wp-content/uploads/2020/09/0-1.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img64](https://ohana-hills.com/wp-content/uploads/2020/09/55.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img65](https://ohana-hills.com/wp-content/uploads/2020/09/56.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img66](https://ohana-hills.com/wp-content/uploads/2020/09/57.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img67](https://ohana-hills.com/wp-content/uploads/2020/09/58.bmp)
11. Villa C3
Finished construction stages:
a) Ground floor slab on grade
b) Ground floor columns
![Luxury Villas In Lebanon - Progress Report August2020- img68](https://ohana-hills.com/wp-content/uploads/2020/09/00-1.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img69](https://ohana-hills.com/wp-content/uploads/2020/09/59.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img70](https://ohana-hills.com/wp-content/uploads/2020/09/60.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img71](https://ohana-hills.com/wp-content/uploads/2020/09/61.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img72](https://ohana-hills.com/wp-content/uploads/2020/09/62.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img73](https://ohana-hills.com/wp-content/uploads/2020/09/63.bmp)
12. Villa C4
Finished construction stages:
a) Column necks
b) Ground floor slab on grade
c) Ground floor columns
![Luxury Villas In Lebanon - Progress Report August2020- img74](https://ohana-hills.com/wp-content/uploads/2020/09/000-1.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img75](https://ohana-hills.com/wp-content/uploads/2020/09/64.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img76](https://ohana-hills.com/wp-content/uploads/2020/09/65.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img77](https://ohana-hills.com/wp-content/uploads/2020/09/66.bmp)
13. Villa C6
Finished construction stages:
a) Basement slab on grade
b) Basement columns and retaining walls
c) Ground floor
![Luxury Villas In Lebanon - Progress Report August2020- img78](https://ohana-hills.com/wp-content/uploads/2020/09/0000-1.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img79](https://ohana-hills.com/wp-content/uploads/2020/09/67-1.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img80](https://ohana-hills.com/wp-content/uploads/2020/09/68.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img81](https://ohana-hills.com/wp-content/uploads/2020/09/69.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img82](https://ohana-hills.com/wp-content/uploads/2020/09/70.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img83](https://ohana-hills.com/wp-content/uploads/2020/09/71.bmp)
14. Villa C7
Finished construction stages:
a) Foundations at basement level
b) Basement slab on grade
c) Basement columns and retaining walls
d) Ground floor slab
![Luxury Villas In Lebanon - Progress Report August2020- img84](https://ohana-hills.com/wp-content/uploads/2020/09/00000-1.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img85](https://ohana-hills.com/wp-content/uploads/2020/09/72.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img86](https://ohana-hills.com/wp-content/uploads/2020/09/73.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img87](https://ohana-hills.com/wp-content/uploads/2020/09/74.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img88](https://ohana-hills.com/wp-content/uploads/2020/09/75.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img89](https://ohana-hills.com/wp-content/uploads/2020/09/76.bmp)
15. Villa C8
Finished construction stages:
a) Excavations
b) Foundations reinforcements
![Luxury Villas In Lebanon - Progress Report August2020- img90](https://ohana-hills.com/wp-content/uploads/2020/09/000000-1.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img91](https://ohana-hills.com/wp-content/uploads/2020/09/77.bmp)
16. Villa C14
Finished construction stages:
a) Excavation
b) Blinding layer
c) Foundations
d) Columns necks and retaining walls
e) Basement slab on grade
f) Basement columns and retaining walls
![Luxury Villas In Lebanon - Progress Report August2020- img92](https://ohana-hills.com/wp-content/uploads/2020/09/0000000-1.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img93](https://ohana-hills.com/wp-content/uploads/2020/09/78.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img94](https://ohana-hills.com/wp-content/uploads/2020/09/79.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img95](https://ohana-hills.com/wp-content/uploads/2020/09/80.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img96](https://ohana-hills.com/wp-content/uploads/2020/09/81.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img97](https://ohana-hills.com/wp-content/uploads/2020/09/82.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img98](https://ohana-hills.com/wp-content/uploads/2020/09/83.bmp)
17. Villa C15
Finished construction stages:
a) Excavation
b) Blinding layer
c) Foundations
d) Column necks and retaining walls
e) Basement slab on grade
![Luxury Villas In Lebanon - Progress Report August2020- img99](https://ohana-hills.com/wp-content/uploads/2020/09/00-2.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img100](https://ohana-hills.com/wp-content/uploads/2020/09/84.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img101](https://ohana-hills.com/wp-content/uploads/2020/09/86.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img102](https://ohana-hills.com/wp-content/uploads/2020/09/87.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img103](https://ohana-hills.com/wp-content/uploads/2020/09/88.bmp)
18. Villa D10
Finished construction stages:
a) Blinding layer
b) Foundations
c) Basement slab on grade
d) Basement columns and retaining walls
e) Ground floor slab shutter work
![Luxury Villas In Lebanon - Progress Report August2020- img104](https://ohana-hills.com/wp-content/uploads/2020/09/0-2.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img105](https://ohana-hills.com/wp-content/uploads/2020/09/89.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img106](https://ohana-hills.com/wp-content/uploads/2020/09/90.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img107](https://ohana-hills.com/wp-content/uploads/2020/09/91.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img108](https://ohana-hills.com/wp-content/uploads/2020/09/92.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img109](https://ohana-hills.com/wp-content/uploads/2020/09/93.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img110](https://ohana-hills.com/wp-content/uploads/2020/09/94.bmp)
19. Villa D11
Finished construction stages:
a) Excavations
![Luxury Villas In Lebanon - Progress Report August2020- img111](https://ohana-hills.com/wp-content/uploads/2020/09/00-3.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img112](https://ohana-hills.com/wp-content/uploads/2020/09/95.bmp)
20. Villa D18
Finished construction stages:
a) Excavation
b) Blinding layer
c) Foundations
d) Column necks
![Luxury Villas In Lebanon - Progress Report August2020- img114](https://ohana-hills.com/wp-content/uploads/2020/09/000-2.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img115](https://ohana-hills.com/wp-content/uploads/2020/09/96.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img116](https://ohana-hills.com/wp-content/uploads/2020/09/97.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img117](https://ohana-hills.com/wp-content/uploads/2020/09/98.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img118](https://ohana-hills.com/wp-content/uploads/2020/09/99.bmp)
21. Villa E1
Finished construction stages:
a) Excavation
b) Blinding layer
c) Foundations
![Luxury Villas In Lebanon - Progress Report August2020- img119](https://ohana-hills.com/wp-content/uploads/2020/09/0000-2.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img120](https://ohana-hills.com/wp-content/uploads/2020/09/100.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img121](https://ohana-hills.com/wp-content/uploads/2020/09/101.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img122](https://ohana-hills.com/wp-content/uploads/2020/09/102.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img123](https://ohana-hills.com/wp-content/uploads/2020/09/103.bmp)
22. Villa E2
Finished construction stages:
a) Excavation
b) Blinding layer
c) Foundations
d) Column and retaining wall necks
![Luxury Villas In Lebanon - Progress Report August2020- img124](https://ohana-hills.com/wp-content/uploads/2020/09/00000-2.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img125](https://ohana-hills.com/wp-content/uploads/2020/09/104.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img126](https://ohana-hills.com/wp-content/uploads/2020/09/105.bmp)
II. Walls
1. Villa B5 Walls
![Luxury Villas In Lebanon - Progress Report August2020- img127](https://ohana-hills.com/wp-content/uploads/2020/09/000000-2.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img128](https://ohana-hills.com/wp-content/uploads/2020/09/1-2.bmp)
2. Villa C3 Walls
![Luxury Villas In Lebanon - Progress Report August2020- img129](https://ohana-hills.com/wp-content/uploads/2020/09/2-1.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img130](https://ohana-hills.com/wp-content/uploads/2020/09/3-1.bmp)
3. Villa C4 Walls
![Luxury Villas In Lebanon - Progress Report August2020- img131](https://ohana-hills.com/wp-content/uploads/2020/09/4-1.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img132](https://ohana-hills.com/wp-content/uploads/2020/09/5-1.bmp)
4. Villa C1-C5 Side Wall
![Luxury Villas In Lebanon - Progress Report August2020- img133](https://ohana-hills.com/wp-content/uploads/2020/09/6-1.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img134](https://ohana-hills.com/wp-content/uploads/2020/09/7-1.bmp)
5. Zone E Walls
![Luxury Villas In Lebanon - Progress Report August2020- img135](https://ohana-hills.com/wp-content/uploads/2020/09/8-1.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img136](https://ohana-hills.com/wp-content/uploads/2020/09/9-1.bmp)
III. Roads and Infrastructure
- All main roads subgrade layers are finished and ready for asphalt pavement.
![Luxury Villas In Lebanon - Progress Report August2020- img136](https://ohana-hills.com/wp-content/uploads/2020/09/1-3.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img137](https://ohana-hills.com/wp-content/uploads/2020/09/2-2.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img138](https://ohana-hills.com/wp-content/uploads/2020/09/3-2.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img139](https://ohana-hills.com/wp-content/uploads/2020/09/4-2.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img140](https://ohana-hills.com/wp-content/uploads/2020/09/5-2.bmp)
![Luxury Villas In Lebanon - Progress Report August2020- img141](https://ohana-hills.com/wp-content/uploads/2020/09/6-2.bmp)