I. VILLAS CONSTRUCTION PROGRESS
1. Villa A2
Finished Constructing Stages:
a) Attic roof concrete pitched slab
b) Mechanical and electrical pipes and connections
c) Plaster Work
d) Sandtex Paint
e) Cladding
f) Tiling in progress
















2. Villa A3
Finish Construction Stages:
a) Foundations
b) Slab on Grade
c) Basement Columns and Retaining Walls
d) Swimming Pool




2. Villa B1
Finished construction stages:
a) Basement block/partition walls
b) Outer walls insulation
c) RC Swimming Pool



3. Villa B2
Finished construction stages:
a) Slab on grade
b) Basement columns
c) Ground floor post-tension slab
d) Block/partition walls at basement level



reinforcement

work
4. Villa B3
Finished construction stages:
a) Foundations
b) Basement slab on grade
c) Basement Columns and retaining walls
d) Swimming Pool
e) Ground floor reinforced concrete slab
f) Block/partition walls


5. Villa B4
Finished construction stages:
a) First floor PT slab
b) Swimming pool






6. Villa B5
Finished construction stages
a) Slab on grade
b) Ground floor columns
c) First Floor PT slab
d) Block/partition walls





7. Villa B6
Finished construction stages:
a) Ground floor PT slab



8. Villa B7
Finished construction stages:
a) Ground floor PT slab
b) RC Swimming Pool





9. Villa C1
Finished construction stages:
a) Block/partition walls.
b) RC Swimming Pool



10. Villa C2
Finished construction stages:
a) Basement block/partition walls


11. Villa C3
Finished construction stages:
a) 1st Floor PT slab
b) Ground floor block/partition walls



12. Villa C4
Finished construction stages:
a) 1st Floor PT slab



13. Villa C6
Finished construction stages:
a) Basement block/partition walls


14. Villa C7
Finished construction stages:
a) Foundations at the basement level
b) Swimming Pool



15. Villa C8
Finished construction stages:
a) Foundations
b) Slab on grade
c) Basement columns
d) Ground Floor PT slab





16. Villa C11
Finished construction stages:
a) Foundations


17. Villa C14
Finished construction stages:
a) Ground Floor Slab Formwork
b) Ground Floor PT slab
c) Block/partition walls





18. Villa C15
Finished construction stages:
a) Ground Floor PT slab
b) Block/partition walls



20. Villa D1
Finished construction stages:
a) Excavation and Foundations
b) Column Necks
c) Soil Fill and Slab on Grade
d) Basement Columns and Retaining Walls
e) Ground Floor PT Slab






21. Villa D3
Finished construction stages:
a) Excavation and Foundations
b) Column Necks
c) Soil Fill and Slab on Grade
d) Basement Columns and Retaining Walls
e) Ground Floor PT Slab Formwork





22. Villa D5
Finished construction stages:
a) Excavation and Foundations
b) Column Necks
c) Tie Beams


23. Villa D6
Finished construction stages:
a) Excavation and Foundations
b) Column Necks
c) Soil Fill and Slab on Grade
d) Basement Columns and Retaining Walls



24. Villa D7
Finished construction stages:
a) Excavation and Foundations
b) Column Necks
c) Soil Fill and Slab on Grade
d) Basement Columns and Retaining Walls




25. Villa D8
Finished construction stages:
a) Excavation and Foundations
b) Column Necks
c) Soil Fill and Slab on Grade
d) Basement Columns


26. Villa D9
Finished construction stage:
a) Excavation and Foundations


27. Villa D10
Finished construction stages:
a) Ground Floor Slab
b) Block/partition walls
c) Swimming Pool




28. Villa D11
Finished construction stages:
a) Foundations
b) Slab on Grade
c) Basement Columns
d) Ground Floor PT slab




29. Villa D14 A
Finished construction stages:
a) Foundations
b) Slab on Grade
c) Basement Columns
d) 1st Floor PT slab


30. Villa D14 B
Finished construction stages:
a) Foundations
b) Slab on Grade
c) Basement Columns
d) 1st Floor PT slab


31. Villa D18
Finished construction stages:
a) Parking Extension
b) Slab on Grade
c) Ground Floor Columns



32. Villa E1
Finished construction stages:
a) Slab on Grade
b) Basement Columns
c) Ground Floor PT Slab



33. Villa E2
Finished construction stages:
a) Slab on Grade
b) Basement Columns
c) Ground Floor PT Slab




34. Villa E13
Finished construction stages:
a) Foundations and Slab on Grade
b) Basement Columns and Retaining Walls



35. Villa F7
Finished construction stages:
a) Excavation


II. WALLS
Zone B




Zone D


III. Roads and Infrastructures
- All main roads are paved


- All main roads subgrade layers are finished and ready for asphalt pavement.




