I. VILLAS CONSTRUCTION PROGRESS

Zone A
1. Villa A2

a) Columns at the basement level are constructed
b) Mid retaining walls are executed
c) Columns and walls in contact with soil are isolated using Bitumen
d) MEP pipes are installed along the columns
e) Slab on grade is executed
f) Swimming pool is under construction

Figure 1 – Shutter work for columns

Figure 2 – Shutter work for retaining walls

Figure 3 – Columns cast and MEP works constructed

Figure 4 – Retaining walls

Figure 5 – Isolating the concrete with Bitumen

Figure 6 – Using proper filling material under the swimming pool

Figure 7 – Strengthening the rock fill with concrete

Figure 8 – Swimming pool blinding layer has been cast and isolated with bitumen

Figure 9 – Raft reinforcements and MEP pipes are constructed

Figure 10 – Casting of the raft foundation and watering the concrete

Figure 11 – Slab on grade reinforcements isolated from the soil by a nylon sheet

Figure 12 – Slab on grade concrete cast

Figure 13 – Constructing the partition block walls on the basement floor

Zone B
2.Villa B1

a) Soil fill is compacted
b) Tie beams are constructed
c) Slab on grade reinforcements are isolated from
the underlying soil using a nylon sheet
d) Manholes and MEP system at the slab on grade level is executed
e) Slab on grade has been cast

Figure 14 – Compaction of the filled soil

Figure 15 – Preparing the tie beams reinforcements

Figure 16 – Leveling the slab on grade and addition of reinforcements

Figure 17 – Manhole and MEP pipes

Figure 18 – Nylon Isolation and slab on grade reinforcements

Figure 19 – Slab on grade concrete work finished

Figure 20 – Column steel reinforcements are coated with a corrosion-resistant material (Epoxy)

 3.Villa B4
a) Swimming Pool is being excavated
b) Foundations are ready for construction

Figure 21 – Swimming pool under excavation

4.Villa B5
Villa B5 is currently being excavated

Figure 22 – Villa B5 Location

Figure 23 – Villa B5 excavation

5.Vila B6
a) Foundations form work and reinforcements are constructed
b) Concrete foundations are cast
c) MEP works at the basement level is prepared
d) Tie beams and slab on grade are constructed over a nylon isolation sheet in the lower level of the basement floor
e) Spandrel beams are constructed to carry the upper level of the basement floor

Figure 24 – Foundations reinforcements work supervised by our engineers

Figure 25 – Slab on grade reinforcements distributed over a nylon layer

Figure 26 – Slab on grade concrete cast

Figure 27 – Spandrel beams for the upper basement level

6.Villa B7
a) Columns necks are constructed up to the slab on grade level
b) Concrete in contact with soil is isolated with Bitumen
c) Soil fill is added
d) Tie beams are constructed
e) MEP works at the basement level is prepared
f) Slab on grade reinforcements are distributed over a nylon sheet
g) Slab on grade concrete has been cast

Figure 28 – Shuttering work for the retaining walls

Figure 29 – Column and retaining walls have been cast and covered with Bitumen, soil fill is being introduced

Figure 30 – Preparing the MEP pipes and the tie beams at the slab on grade level

Figure 31 – Manhole and MEP works

Figure 32 – Slab on grade reinforcements isolated from the soil by a nylon sheet

Figure 33 – Slab on grade concrete cast

ZoneC
7.Villa C1
a) Foundations formwork and reinforcements are constructed
b) Concrete foundations, column necks and retaining walls are cast and isolated with bitumen
c) Soil fill is added to reach the basement level
d) Tie beams and slab on grade are being executed

Figure 34 – Foundations Formwork

Figure 35 – Foundations Reinforcements

Figure 36 – Casting of foundation

Figure 37 – Column necks and retaining walls formwork and reinforcements

Figure 38 – Concrete columns and walls are cast and isolated with bitumen

Figure 39 – Soil fill added

Figure 40 – Tie beams under construction

Figure 41 – Slab on grade concrete cast

 8.Villa C2
a)NBlinding layer has been cast
b) Foundations formwork and reinforcements are constructed
c) Concrete foundations, column necks and retaining walls are cast and isolated with bitumen
d) Soil fill is added to reach the basement level

Figure 42 – Casting of the blinding layer

Figure 43 – Constructing foundations reinforcements and formwork

Figure 44 – Casting concrete foundations

Figure 45 – Concrete column necks cast and retaining wall reinforcements are being prepared

Figure 46 – Concrete elements are isolated with Bitumen and soil fill is being introduced

Figure 47 – Tie beams constructed at an intermediate level to prevent buckling of columns

9.Villa C3
a) Soil is excavated to reach the rock layer
b) Blinding layer has been cast
c) Foundations have been constructed

Figure 48 – Excavation of Villa C3

Figure 49 – Concrete blinding Layer

Figure 50 – Installing steel reinforcements

Figure 51 – Foundations and column necks are constructed and soil fill added

10.Villa C4
Villa C4 is currently in the excavation stage.

Figure 52 – Villa C4 under excavation

11.Villa C6
a) Excavations are finished
b) Blinding layer has been cast
c)n Foundations formwork and reinforcements are constructed
d) Concrete foundations have been cast

Figure 53 – Excavations process

Figure 54 – Concrete blinding layer

Figure 55 – Casting of the foundations

Figure 56 – Addition of soil fill

12.Villa C7
e) Excavations are done
f) Blinding layer has been cast
g) Foundations formwork and reinforcements are constructed
h) Swimming pool is excavated

Figure 57 – Excavations

Figure 58 – Blinding Layer

Figure 59 – Preparing the foundations reinforcements

Figure 60 – Swimming pool excavation

13.Villa C8
Villa C8 is currently in the excavation stage

Figure 61 – Excavation of villa C8

Figure 62 – Excavations of villa C8

ZoneD
14.Villa D10
Villa D10 is currently in the excavation stage

Figure 63 – Excavation of Villa D10

II. WALLS CONSTRUCTION PROGRESS

 Walls in Zone A 
 Walls in Zone B 
 Walls in Zone E 

III.ROADS CONSTRUCTION PROGRESS

1. Northern Road
The remaining part of northern is ready for the asphalt pavement, manholes and drainage pipes are being installed.

Figure 64 – Road 1 on map

Figure 65 – Road 1 on site

Figure 66 – Sidewalk

Figure 67 – Pipes and manholes

2. North-western Exist
The north-western exit is currently being excavated and drainage pipes are being installed.

Figure 68 – North-western exit on map

Figure 69 – North-western exit on site

3. Western Road
The western road is excavated, base-coarse laid and pipes installed.

Figure 70 – Western road on the map

Figure 71 – Western road on site

Figure 72 – Infrastructure lines

Figure 73 – View from the junction at the end of the western road

4. Southern Road
Some parts of the southern road are ready for asphalt pavement and the rest is under excavations. Infrastructure pipes are being installed.

Figure 74 – Southern road-ready for pavement on map

Figure 75 – Southern road-ready for pavement on-site

Figure 76 – Southern road under excavation on map

Figure 77 – Southern road under excavation on site

5. Southern Exit
The southern exit is currently under excavation.