I. OVERVIEW

 

Ohana Hills is a passionate project aiming to construct 84 Villas according to the highest structural standards and finishing quality. Located at Medyar village in Damour, this unique location allows you to enjoy the beauty and peacefulness of nature while at the same time keeping you close to the capital city and the major business and trading centers. This report will guide you through the most recent updates on the different construction stages throughout the project. We hope that Ohana Hills will be the beginning of another happy and fruitful chapter in your life.

 

 

II- ENVIRONMENT AND LANDSCAPING

 

In this section, we’re going to take a walk throughout the surrounding environment and landscapes before heading into the technical stuff

 

“Green roads along with the breathtaking calmness of the sea”

“Iconic monuments to keep your ride interesting”

“Welcoming every visitor with a red rose”

“A traditional-aged olive tree”

 

III. ROADS & INFRASTRUCTURE

 

In this section, we will take  a look at the roads and infrastructures that will connect the entirety of Ohana Hills and provide necessary services.

 

 Road 1 is located in the northern area of the map. The part of the road facing area A is already completed while the other half is being constructed as shown in the image below.

Base-course laid and sidewalks under construction

Road Entrance Completed

 

2. ROAD 2

 Road 2 is on the eastern side and is already completed.

Green plants covering the highway median and green energy solar panels for illuminating your way

 

3. ROAD 3

 

Road 3 lies in the southern area of the map. Excavation is finished and base-course is being laid.

Excavation process

Laying base-course and constructing sidewalks

Pipes junctions

Excavations at the end of the road

Road 3 under shades of blue

 

4. ROAD A

 Road A lies in-between zones A and B and it’s currently in the excavation stage.

Road A eastern side

Mid-way through the excavation

5. ROAD B

 Road A eastern side  
Road B lies in-between zones B and C and it’s currently in the excavation stage.

Road B eastern side

 

6. ROAD C

 

Road C lies in-between zones C and D and it’s currently in the excavation stage.

Excavations through Road C

 

7. ROAD D

 

Road D lies in-between zones D and E and it’s currently in the excavation stage.

Road D southern entrance

 

8. RETAINING WALLS

Retaining walls support the soil laterally so that it can be retained at different levels on the two sides.

 Building walls above  the sea

Wall in Zone A

MAP

SITE

 

Wall in Zone B

MAP

 SITE

 

MAP

SITE

Wall in Zone C

MAP

SITE

Wall in Zone D

MAP

SITE

IV- VILLAS CONSTRUCTION PROGRESS

In this section, we’re going to present the progress of the different villas in the construction stage.

 

VILLA A1

Villa Al is completed and  currently available for customer visits.

VILLA A2

Blinding concrete layer is constructed over the ground surface. Blinding concrete act as an insulation layer over which the actual reinforced foundations will be cast. Soil fill is then introduced to the empty spaces between the footings.

VILLA A3

 

villa A3 is currently in the excavation stage
Villa A3 location

VILLA B1

 

Excavations in villa B1 are finished and blinding layer is being constructed.

Excavating and setting up footings locations

Casting the blinding concrete layer

VILLA B2

 Villa B2 is currently in the excavation stage.

Villa B2 Location

VILLA B3

 

 Blinding concrete and soil fill layers are completed and MEP works are installed

Blinding layer at the ground floor level

MEP works at the basement level

Basement level

Soil fill layer

Preparing the steel reinforcements

VILLA B4

 

Villa B4 excavation is completed, footings locations are set and it’s ready for the blinding phase.

 Setting up footings locations

Laying out  the foundations outline using wood panels

VILLA B5

Villa B5 is currently in the excavation phase.

Villa B5 location

VILLA B6

 

Villa B6 is currently in the excavation phase

VILLA B7

 

Villa B7 is currently in the excavation phase

Villa B7 location

VILLA C1

 

 Villa C1 is currently in the excavation phase

Villa C1 location

VILLA C2

 Villa C2 is currently in the excavation phase

Villa C2 location

VILLA C7

 

Villa C7 is currently in the excavation phase

Villa C7 location

VILLA C8

Villa C8 is currently in the excavation phase

Villa C8 location

VILLA C9

Villa C9 is currently in the excavation phase

Villa C9 location

VILLA C15

 

Villa C15 is currently in the excavation phase

Villa C15 location

THANK YOU