I. VILLAS CONSTRUCTION PROGRESS

1. Villa A2

Figure 1 Ground floor slab formwork
Figure 2 Ground floor slab reinforcements
Figure 3 Ground floor after casting of concrete
Figure 4 Formwork for ground floor columns
Figure 5 Ground floor columns after concrete casting along with some shutter work for the 1st floor slab
Figure 6 1st floor slab reinforcements, post-tension cables and electric cables
Figure 7 1st floor slab concrete cast and column reinforcements are prepared
Figure 8 1st floor columns cast
Figure 9 2nd floor slab formwork
Figure 10 During concrete casting of slab
Figure 11 Stairs Reinforcements
Figure 12 Applying SBS membrane insulation layer
Figure 13 Layers of isolation: Reparation coating, SBS membrane, Cartonal and Concrete Blocks
Figure 14 Quality control: Preparing concrete cylinders for compression testing
Figure 15 Swimming pool formwork
Figure 16 Swimming pool walls after concrete casting
Figure 17 Swimming pool after concrete casting
Figure 18 Attic roof form work and reinforcements
Figure 19 Reinforcements details

2. Villa B1

Finished construction stages:
a) Basement columns and retaining walls
b) Ground floor slab
c) Basement block/partition walls

Figure 20 Basement Columns formwork and reinforcements
Figure 21 Basement Columns after concrete cast
Figure 22 Ground floor slab formwork
Figure 23 Ground floor PT slab during concrete casting
Figure 24 Ground floor PT slab after concrete cast
Figure 25 Basement block wall
Figure 26 Walls insulation

3. Villa B2

Finished construction stages:
d) Excavation
e) Blinding concrete layer
f) Foundations
g) Column necks and retaining walls
h) Swimming Pool

Figure 27 Excavations
Figure 28 Foundations formworks and reinforcements
Figure 29 Foundations after concrete cast
Figure 30 Swimming pool bottom reinforcements
Figure 31 Swimming pool after concrete cast
Figure 32 Swimming pool walls after concrete cast

4. Villa B3

Finished construction stages:
a) Foundations
b) Basement slab on grade
c) Basement Columns and retaining walls
d) Swimming Pool

Figure 33 Foundations reinforcements
Figure 34 Preparing Slab on grade reinforcements above a nylon layer
Figure 35 Foundations and slab on grade after concrete cast along with the column’s reinforcements
Figure 36 Columns after concrete cast and formwork preparations for the ground floor slab
Figure 37 Part of the ground floor slab
Figure 38 Swimming pool

5. Villa B4

Finished construction stages:
a) Foundations
b) Basement Slab on grade
c) Basement Columns

Figure 39 Foundations reinforcements
Figure 40 Foundations after concrete cast and Bitumen isolation
Figure 41 Slab on grade along with the MEP works
Figure 42 Ground floor columns

6. Villa B5

Finished construction stages:
a) Excavation
b) Blinding layer
c) Foundations
d) Column necks

Figure 43 Excavation and blinding layer
Figure 44 Foundations formwork and reinforcements
Figure 45 Foundations after concrete cast and column necks reinforcements
Figure 46 Concrete Column necks with Bitumen isolation

7. Villa B6

Finished construction stages:
a) Basement columns and retaining walls

Figure 47 Columns and retaining walls after concrete cast

8. Villa B7

Finished construction stages:
a) Basement columns and retaining walls

Figure 48 Basement columns and retaining walls after concrete cast

9. Villa C1

Finished construction stages:
a) Basement columns and retaining walls
b) Ground floor slab

Figure 49 Basement columns and retaining walls
Figure 50 High quality plywood used for formwork
Figure 51 Retaining wall smooth surface after concrete cast
Figure 52 Ground floor slab post-tension strands
Figure 53 Additional reinforcements at the strand›s start
Figure 54 Ground floor slab during concrete casting

10. Villa C2

Finished construction stages:
a) Slab on grade
b) Basement columns and retaining walls
c) Ground floor slab

Figure 55 Slab on grade reinforcements
Figure 56 Basement Column reinforcements
Figure 57 Retaining walls constructed and first floor slab formwork done
Figure 58 Concrete casting of the first-floor post tension slab

11. Villa C3

Finished construction stages:
a) Ground floor slab on grade
b) Ground floor columns

Figure 59 Tie beams constructed between columns
Figure 60 Column necks reinforcements
Figure 61 Insulating columns with Bitumen
Figure 62 Introducing fill material to reach the ground floor level
Figure 63 Ground floor slab on grade and columns

12. Villa C4

Finished construction stages:
a) Column necks
b) Ground floor slab on grade
c) Ground floor columns

Figure 64 Column necks after isolation and introduction of soil fill
Figure 65 Ground floor slab on grade
Figure 66 Ground floor columns

13. Villa C6

Finished construction stages:
a) Basement slab on grade
b) Basement columns and retaining walls
c) Ground floor

Figure 67 Slab on grade reinforcements
Figure 68 Basement slab on grade
Figure 69 Tie beams and retaining walls formwork
Figure 70 Retaining walls after concrete cast
Figure 71 Ground floor slab reinforcements

14. Villa C7

Finished construction stages:
a) Foundations at basement level
b) Basement slab on grade
c) Basement columns and retaining walls
d) Ground floor slab

Figure 72 Foundations Reinforcements at basement level
Figure 73 Basement slab on grade
Figure 74 Basement columns formwork
Figure 75 Basement columns after concrete cast
Figure 76 Ground floor post tension slab

15. Villa C8

Finished construction stages:
a) Excavations
b) Foundations reinforcements

Figure 77 Foundations Reinforcements

16. Villa C14

Finished construction stages:
a) Excavation
b) Blinding layer
c) Foundations
d) Columns necks and retaining walls
e) Basement slab on grade
f) Basement columns and retaining walls

Figure 78 Foundations Reinforcements
Figure 79 Foundations after concrete cast and Bitumen isolation
Figure 80 Slab on grade reinforcements
Figure 81 Basement slab on grade
Figure 82 Basement columns reinforcements
Figure 83 Basement columns and retaining wall after concrete casting

17. Villa C15

Finished construction stages:
a) Excavation
b) Blinding layer
c) Foundations
d) Column necks and retaining walls
e) Basement slab on grade

Figure 84 Blinding layer and excavation
Figure 86 Foundations reinforcements
Figure 87 Soil fill at the basement level
Figure 88 Basement columns and retaining walls

18. Villa D10

Finished construction stages:
a) Blinding layer
b) Foundations
c) Basement slab on grade
d) Basement columns and retaining walls
e) Ground floor slab shutter work

Figure 89 Blinding layer
Figure 90 Foundations reinforcements and formwork
Figure 91 Concrete foundations cast and soil fill introduced
Figure 92 Slab on grade reinforcements
Figure 93 Ground floor PT slab reinforcements
Figure 94 Basement roof after concrete cast

19. Villa D11

Finished construction stages:
a) Excavations

Figure 95 Excavations and foundations reinforcements

20. Villa D18

Finished construction stages:
a) Excavation
b) Blinding layer
c) Foundations
d) Column necks

Figure 96 Excavations
Figure 97 Concrete Foundations
Figure 98 Column necks reinforcements
Figure 99 Columns necks after isolating them and introducing soil fill

21. Villa E1

Finished construction stages:
a) Excavation
b) Blinding layer
c) Foundations

Figure 100 Excavations
Figure 101 Foundations
Figure 102 Column and retaining wall necks
Figure 103 Tie beam reinforcements at slab on grade level

22. Villa E2

Finished construction stages:
a) Excavation
b) Blinding layer
c) Foundations
d) Column and retaining wall necks

Figure 104 Excavation and blinding layer
Figure 105 Foundations, column necks and retaining walls

II. Walls

1. Villa B5 Walls

2. Villa C3 Walls

3. Villa C4 Walls

4. C1-C5 Side Wall

5. Zone E Walls

III. Roads and Infrastructure

All main roads subgrade layers are finished and ready for asphalt pavement.